Apparel Production

Broadly we follow four steps or processes in delivering the garments

Pre-production

Bulk Production

To control or minimize shrinkage, the fabrics go through a pre-shrunk wash and sampling. Changes or modifications in detailing, such as cut fit, print colours, and size are finalized in pre-production sampling before bulk production starts.

After confirmation of sample, purchase order, down payment, and artwork, we take about 4-8 weeks times for manufacturing the apparel.

Quality Assurance

Packaging

This is the central process at Asenso where we strive to consistently create and deliver quality products for our customers. Asenso’s QC teams carry out rigorous quality control checks on every product and piece of garment before packaging.

Packaging is more than a functional or aesthetic element. All products are steam-ironed, neatly folded, and packed individually or separately into poly bags and boxed before shipping to their destinations.